Construction
A pool is planned well before the ground is broken: location, dimensions, access for machinery, connections. Send photos of the plot and an idea of the dimensions you want for a first conversation.
The permits needed depend on the town council: it is best to check with the town hall early in the project.

Renovation
Peeling mosaic, blackened grout, cracked coping, a shell losing water: renovation brings the pool back into shape without necessarily redoing everything. Describe what you see and Mika will tell you what can be put right.
- Replacing the mosaic or the lining
- Repairing or replacing the coping
- Repairing cracks in the shell
- Restoring the surround around the pool
Maintenance
Clear water needs regular cleaning and checks, especially in summer and when starting the pool up again in spring.
Maintenance is also useful for a second home: the pool stays clean between stays.
Useful guides before work starts
- building permits in AlicanteLicence or responsible declaration: the paperwork to file at the town hall for your project, in the province of Alicante.
- non-slip tiles for pool and terraceClasses 1, 2 and 3, R11, class B: how to read a tile's spec sheet for a pool, a terrace or a bathroom.
